Skip to content
Advertisement
Hosinger Special Offer

Overhead Rate Calculator

Overhead Rate Calculator from Gizcalc helps you estimate results quickly within the Business & Accounting category.

  • Instant results
  • Charts & tables
  • Save & compare
  • Private – runs in your browser
Overhead Absorption Rate —

Sample inputs are pre-filled so you can see a result quickly. Results are estimates only and may not be accurate because prices, interest rates, taxes, fees, fuel costs, tariffs, market returns, medical costs, and local rules can change. Please verify current values before making financial, tax, legal, medical, or business decisions.

Formula used

Overhead rate = Budgeted overheads ÷ Budgeted base

  • Applied overhead = rate × base used by the job
  • Job cost = direct cost + applied overhead

About the Overhead Rate Calculator

What is the Overhead Rate Calculator?

Indirect costs such as factory rent, supervision and power must be spread over the jobs or products that use them. The overhead absorption rate does this using a base such as labour hours, machine hours or labour cost.

Enter the budgeted overheads and the total of the base for the period to get the rate, then apply it to a job to find its full cost.

How to use the Overhead Rate Calculator

  1. Budgeted Overheads for the Period (₹) (sample: 12,00,000)
  2. Allocation Base (sample: Direct labour hours)
  3. Total of the Base for the Period (sample: 8,000)
  4. Base Used by This Job or Product (sample: 120)
  5. Direct Cost of This Job (₹) (sample: 45,000)
  6. Press Calculate Overhead Rate (results also refresh as you type). The result card shows the Overhead Absorption Rate, along with Overhead applied to this job, Total job cost and Overhead share of job cost.

Formula used

Overhead rate = Budgeted overheads ÷ Budgeted base

  • Applied overhead = rate × base used by the job
  • Job cost = direct cost + applied overhead

Use machine hours in automated plants and labour hours in labour-intensive work.

Worked example

These are the sample values already filled in the calculator above, and the result it returns for them:

InputSample value
Budgeted Overheads for the Period (₹)12,00,000
Allocation BaseDirect labour hours
Total of the Base for the Period8,000
Base Used by This Job or Product120
Direct Cost of This Job (₹)45,000
ResultValue
Overhead Absorption Rate₹150 per hour
Overhead applied to this job₹18,000
Total job cost₹63,000
Overhead share of job cost28.6%

Tips for using the Overhead Rate Calculator

  • Compare applied and actual overheads at period end; the difference is under- or over-absorption.
  • Use separate rates for departments with very different cost structures.

Frequently asked questions

Divide overheads by the hours. ₹12 lakh of overheads over 8,000 labour hours is ₹150 per hour.

The one that best drives the overheads – machine hours for machine-heavy work, labour hours where people do most of the work.

When actual overheads exceed the overheads charged to jobs at the predetermined rate; the gap is a loss for the period.