About the Break-Even Time Calculator
What is the Break-Even Time Calculator?
A new shop, clinic or factory takes time to build sales. The break-even time calculator simulates month-by-month sales growing from a starting level, subtracts fixed costs, and tracks the cumulative position against your upfront investment.
It shows two milestones: the first month with an operating profit, and the month the investment is fully recovered.
How to use the Break-Even Time Calculator
- Upfront Investment – setup, equipment, deposits (₹) (sample: 15,00,000)
- Monthly Fixed Costs (₹) (sample: 1,80,000)
- Average Selling Price per Unit (₹) (sample: 350)
- Variable Cost per Unit (₹) (sample: 200)
- Units Sold in Month 1 (sample: 800)
- Monthly Growth in Units (%) (sample: 8)
- Monthly Capacity Cap (units, 0 for none) (sample: 3,000)
- Press Find Break-Even Month (results also refresh as you type). The result card shows the Investment Recovered In, along with First profitable month, Units needed per month to cover fixed costs and Contribution per unit.
Formula used
Cumulative position = −Investment + Σ (Units × (Price − Variable cost) − Fixed costs)
- Units = month-1 units growing at the monthly growth rate, up to the capacity cap
Payback is reached when the cumulative position turns positive.
Worked example
These are the sample values already filled in the calculator above, and the result it returns for them:
| Input | Sample value |
|---|---|
| Upfront Investment – setup, equipment, deposits (₹) | 15,00,000 |
| Monthly Fixed Costs (₹) | 1,80,000 |
| Average Selling Price per Unit (₹) | 350 |
| Variable Cost per Unit (₹) | 200 |
| Units Sold in Month 1 | 800 |
| Monthly Growth in Units (%) | 8 |
| Monthly Capacity Cap (units, 0 for none) | 3,000 |
| Result | Value |
|---|---|
| Investment Recovered In | Month 19 (1y 7m) |
| First profitable month | Month 7 (7 months) |
| Units needed per month to cover fixed costs | 1,200 |
| Contribution per unit | ₹150 |
Tips for using the Break-Even Time Calculator
- Keep 6–12 months of fixed costs as working capital for the ramp-up period.
- Test a slower growth rate; ramp-ups usually take longer than planned.